Biomass Boilers.

Objective: 

To obtain an extra space to install biomass boilers together with the storage silo for pellet or woodchip fuel.

Result:

Installation of two 20′ containers joined together on the same floor, with the boiler room separated from the storage silo but joined by the hatches for the augers. On the outside, in order to diminish the visual impact, they were covered with imitation wood slats as a ventilated facade.