Scrap Categorization Phase 1

Objective:

Development of first phase of a prototype of a new two-phase installation, for scrap metal categorization.

Result:

Modification of a 40’HC by opening the two sides to place doors.  The structure was reinforced to support heavy loads. Inside a load lifting system was installed using hoists to move the weight on conveyor belts. Homologation included for its transport.